In this project. We were asked to do Schluter Ditra Heat both in the shower floor and the bathroom floor all in once circuit. We started with the Schluter Shower Kit by applying the waterproofing membrane (kerdi) on the walls and installing the shower pan + Curb. After that we then installed the Schluter Ditra Heat Membrane both on the bathroom floor and the shower floor. We then custom cut the curb to allow for the coil to come into the shower. As soon as we were done installing the coil, we applied a coat of mortar on top to cover the coil and also applied the kerdi membrane on the shower. Next day we started the installation of the Bolder Stone Panels and the tile respectively.