Bathroom Renovation in Magrath Heights Edmonton

This Bathroom renovation was done due to a leak on shower from original construction of the shower. The leak originated from the bench form inside corners and it leaked to the back wall of the shower into our clients walk in closet.

Here are some before pictures of the shower and a video of the demolition stage of the bathroom shower.

Here is a time lapse video of the demolition stage

With all the demolition completed, our plumbers and electricians came in for rough in. This shower our client selected a Riobel Fixture with 2 outlets. A handheld with an adjustable anchored bar and a shower head dead centre of the back wall. Beautiful things about this Riobel fixture that our client loves is the preset temperature mixture valve which you can set one to the desired temperature and never really have to touch it again. Just turn on the water and temperature will always be the same.

Our client selected a lit niche for this shower with 2 ceiling pot-lights. American Lighting and Prizm Lighting have great solutions for this application.

Now we’re onto the boarding stage, waterproofing and tile. We use the Schluter Waterproofing systems for most of our showers. We also work with the Wedi Shower Systems, as well as Custom Building Products, Ardex, Laticrete, & Mapei if our client has a preference. Typically client look at us for making that decision and Schluter has always done good by us so we keep on using them.

With all the tiling done, and grouting complete. Our glass installation take place.

The big final step, all finishing touches. The lit niche requires a few extra steps to work well with the tiling. Electrician & plumbing final come through. Silicone our vertical and horizontal plane corners and she’s is good to go.

We want to take this moment to Thank Brett & family for choosing us & giving us the honour to do this job for them. It was a wonderful time for us to do the work for you guys. We would love to hear from you in the future for your future tiling needs.

Here is a small video clip of what the inside looks after all is done.

And lastly a before and after side by side picture of the job finished up.

Looking to renovate my bathroom…

Looking to renovate my bathroom. What should I know before I get started? In what order do I do things?

I have an old house built a long time ago and it’s time to renovate bathroom. How do I get started?

Is it because you have to do a bathtub repair? Looking for bathroom renovation ideas? Is it a good idea to hire a designer or just ourselves? Wondering what the bathroom renovation cost might be? How do you know which renovation contractor to hire? Maybe I am looking for info to help me decide if I should or should do a bathroom remodel?

Are you trying to do it yourself and hire specialty trades? If the answer is NO:

  • Search for and contact a general contracting company OR a bathroom renovating company like us. and get yourself quote 2-3 quotes and go with the company you trust to do the job the most, NOT the cheapest, that doesn’t always mean that you’re getting what you want for the cheapest price. You may be disappointed when it is all said and done. 
  • The rest is pretty straight forward.

Are you trying to do it yourself and hire specialty trades? If the answer is YES:

1-  get your vision clear. Draw the new bathroom. Helps to use a graph paper instead of lined paper. Most importantly are you changing the location of anything or just where it is, just all new instead. Where the toilet will be located, shower location, jacuzzi tub location (built in or self standing), vanity cabinet or pedestal, electrical, etc.

IMG_1510 fronView

2- Once you have a drawing of your new bathroom layout ready. That means you’ve come across these ideas and have to decide things like:

    • Is the new floor area going to be tiled? Do you have enough underlay? There are certain codes we tile setting companies need to follow in order to guarantee the length of the installation will last you.

Inspirational Subfloor Thickness For Tile - underlayment diagram - Walket Site

Inspirational Subfloor Thickness For Tile – underlayment diagram – Walket Site

    • Next is the new revolutionary heated tile floor option. Once you go heated floor you never go back 🙂 Custmized areas for heat as well as split section with different heated settings. Inside the shower, on the bench, bathroom floor. We’ve done them all.

17-1

    • Are you doing a standing shower? Will it have a fibreglass base? Or will you be doing a custom tiled floor shower.

2110534196_985907178163967_7389630892305185602_n

    • If tiled shower, you have the option of barrier less with lineal drain, or just center square drain.

13230153_1024643084290376_110344823736256193_n 29064385_1658828694205142_7884194120388548397_o copy 20507750_1438429562911724_1156312367794266550_o 38457968_1817486261672717_5660739962388086784_o

    • Looking to have a bench in the shower, triangular? Rectangular? How deep?

19-1 copy 111 21730901_1475224332565580_8499239435043564110_n copy 24297252_1547921291962550_144490034991818007_o

    • Will you have a niche in the shower for your shampoo and soap, etc. There are different sizes for this and an option for different tile as backing for an accent.

13445396_1043084815779536_3178025088063078359_n copy 29873411_1675030272584984_5215701537502696038_o 41688231_1875178482570161_1037585612481232896_o copy 47151750_1981129875308354_5906036505419186176_o copy

    • Plumbing wise, there are plenty of options. Single function, 2 function, 3, 4, 5, 6? The sky is the limit. Together with functions you also have options such as jets, how many; waterfall top location, or regular shower head; handheld option with rod.

111 29064385_1658828694205142_7884194120388548397_o 44219848_1916324148455594_2818276579501670400_o

    • Are you interested in having a steam shower in your bathroom, that is also an option.

38430048_1817486318339378_3302431518177099776_o

    • Option for material on bench, barrier, niche. You could do tile, you could do granite, you could quartz. There are no wrong answers.

21730901_1475224332565580_8499239435043564110_n copy

    • Will you be having a jacuzzi tub? Self standing? Built into a wall? Next to shower?

13-1 10245512_981833255238026_7059353432710074682_n 10341597_984074465013905_4774698593238548013_n 13466182_1051077838313567_7117282873871445155_n 20863494_1450888248332522_2979793999321087834_o 26233616_1582088978545781_1264310475889334797_o

    • Vanity. Will it be a pedestal sink? Or a floating cabinet? Built in cabinet?
    • Window. Are you changing location of the shower? Are there any windows on the way? If so, you have to consider changing the location of the window, what covering material you have on the exterior of the door. Will you be able to find the same material? Will you have to improvise. This could turn into a domino effect for the exterior of the house.
    • Considering all the options we just went through, you have to consider the plumbing and electrical that goes behind all of it. Location of the lines, is it a frost wall where you want the shower head/fixtures, the wall would need to be extended. Availability of space in the electrical panel for the new lines needed for heated floor. Waterproof spotlight in the shower. All things need to be considered when thinking about all of that.

3- You have now made all your decision. Get all your QUOTES for specialty trades. Electrical movement if any. Plumbing movement if any. Quote for all the tile work. Quote for bathroom floor covering. Quote for glass. Quote for window, exterior work. Get pricing for new vanity, counter top, faucet, shower, light fixtures, mirror, finishing trim for towel rack, toilet holder, etc.

Let the fun begin. In what order do I do it all. Here goes the run down.

Demo

  • Rip out all floor coverings
  • Rip out all drywall and walls that will not be in the new bathroom blueprint.
  • RIP our old tub / shower, vanity, and clean it all. Blank Canvas.

*note: if you only have one toilet in the house, leave toilet in for as long as possible until you must remove.

Prep

  • Carpentry
    • ceiling, subfloor, window casing, baseboard, door casing, doors, shelfs, etc
    • Install plywood back on (IF there was any toilet, shower relocation)
  • Plumber Rough in.
  • Electrical Rough In.
  • General
    • Cover all walls back up. Install drywall where needed including new shower. 
    • Tape / Mud, finish and paint drywall.
  • Painter. 
    • Come paint all window, door casing.

Finishing

  • Tilesetter / Floor Covering 
    • Get all floor prepped and installed. Shower waterproofed and installed and grouted. 
  • Carpentry
    • Install new Vanity cabinet / Pedestal.
    • Cut and Install new baseboard
  • Counter Top Technician. To come measure the cabinet for final templating of the counter top.
  • Glass / Mirror Technician 
    • measure and template final size of the shower glass
    • Measrure and template mirror size
  • Plumbing. Finishing Stage. Finishing trim shower, vanity faucet, and drain line.
  • Electrical. Finishing Stage. Plugs installed, and cover plate on. Light fixtures installed. Heated floor thermostat programmable installed. 
  • Painter. Come in to do all finishing touches. Paint touch up baseboard, casing.
  • Cleaning Final Stage
  • Silicone tiled corner areas.

And that is a wrap. Finished bathroom and the next day ready for use